Setting Up Environmental Charges

Overview

There are essentially three methods for setting up environmental charges in RentalMan.  One method is using a combination of master file field settings and control record settings only (Method 1).  Another method is using two programs on the Rental File Maintenance (RAMNUM) menu:  Environmental Charge Control Maintenance and Equipment Environmental Charge Maintenance only (Method 2).  The third method is using a combination of Methods 1 and 2, which will be explained in detail below.

 

If you only use one type of environmental charge, you can choose either Method 1 or 2 for setting up that charge; however, if you want advanced control over which equipment incurs environmental charges and the amount that is charged, use Method 2.  If you use more than one type of environmental charge, you should use Method 3.

 

Regardless of the method you use, you must set up at least one miscellaneous charge item in Miscellaneous Charge Item Maintenance to use for environmental charges.  This item must have a miscellaneous charge type of either EC=Environment Charge or TX=Taxes.  You will use this item in your environmental charge setup, whichever method you choose, and it will be the item that defaults on your rental contracts when environmental fees are appropriate.

 

Set up a miscellaneous charge item for each type of environmental fee that you charge.  Examples of environmental fees are:  Texas Diesel Surcharge, Colorado Special Mobile Machinery (SMM) tax, Virginia Short Term Rental tax, EPA charge, and so on.

 

General Settings

Before describing the different methods of using the environmental charge functionality, a general overview of pertinent control records is provided.

EPACHG

Use this control record for your base level of charging environmental fees.  First, turn on environmental charges, and then indicate whether to calculate fees based on a percentage of the contract's rental amount or to use the price in the miscellaneous item you set up as the environmental charge.  This control record also holds the percentage you are using to charge environmental fees (if you are not using the item's price), and the number of the miscellaneous charge item.  This setup applies the environmental charge item to all rentals for all category/classes.

 

If your environmental fees are specific to certain equipment and cannot be determined by category/class, set Select certain equipment to Y.  When this is set to Y, the system checks the last 15 characters of the Miscellaneous (EMMISC) field in Equipment Maintenance, and only applies environmental charges to equipment with those 15 characters populated.  Use control record RAEQM3 to split the Miscellaneous field and label the new field that constitutes the last 15 characters.

EPACH2

Expand on environmental charges via this control record.  You can choose to include damage waiver and delivery and pickup charges in the total amount from which the system calculates the environmental fees.  You can also set the system to tax the environmental charges.  If you want to exempt certain category/classes of equipment from environmental charges, set the Use ECSMM for all equip setting to Y, and then use the Charge SMM/EPA Tax field in Category/Class Maintenance to indicate which category/classes are exempt.

 

If you do not want environmental charges to be applied to customers based on the EPA Charge setting in Customer Master Maintenance, set the Use CMEPAC for SMM chg field to N in this control record.  This setting is used primarily in situations where you charge SMM tax.  No customers are exempt from SMM tax, so setting Use CMEPAC for SMM chg to N ensures that all customers get charged the SMM environmental fee, regardless of the EPA Charge setting in their customer master record.

 

Methods

The following subsections describe the settings for each method.  Several examples are provided to aid in making a decision on which method to use for your organization.

 

 

Method 1

Method 1 is using a combination of master file field settings and control record settings for establishing your environmental charges.  You might choose to use this method if you only use one type of environmental charge, and you use the same charge amount/percentage for all of the equipment to which environmental charges apply.  The critical control record settings are as follows:

Control Record EPACHG

This subsection lists only those fields that are critical for setting up environmental charges on rental contracts.

 

 

Control Record RAEQM3

 

 

Control Record EPACH2

This subsection lists only those fields that are critical for setting up environmental charges on rental contracts.

 

 

Control Record CNTYRQ

 

 

Back to top

The master file fields settings for Method 1 are as follows:

Miscellaneous Charge Item Master File

Create a miscellaneous item for the environmental charge you will be using.  This item must have a miscellaneous charge type of either EC=Environment Charge or TX=Taxes.  If you are NOT applying environmental charges as a percentage of the contract amount, ensure that you have entered a Regular price for the environmental miscellaneous charge item.

 

Customer Master File

If the Use CMEPAC for SMM chg field in the EPACH2 control record is set to Y, then set the EPA Charge field to Y for only those customers that you want to apply EPA charges against.

 

When dealing with charges like SMM tax and the Texas diesel surcharge (non-EPA charges) that must be charged, the Use CMEPAC for SMM chg field is set to N, and this customer master setting is not used.

 

Customer Job Master File

When using environmental charges that are county-specific like SMM tax, enter a valid county in the County field.  First, set the Make county required field to Y in the CNTYRQ control record to require users to enter a valid county on customer job master records, and set up valid counties in County Code Maintenance.

 

County Code Master File

When using environmental charges that are county-specific like SMM tax, set the Charge SMM tax field to Y in County Code Maintenance for the appropriate county master records.

 

Category/Class Master File

Use the Charge SMM/EPA Tax field to indicate whether you want environmental (non-SMM) charges to default on rental contracts for equipment in this category/class.  In order for this functionality to work, you must also set the Use EPA charge field to Y in control record EPACHG to automatically add an environmental charge item to rental contracts.

 

Since SMM taxes are equipment specific, the setting in the Charge SMM/EPA Tax field only indicates if the category/class falls under SMM regulations, and whether to calculate estimated SMM taxes for rental reservations/quotes for the category/class.

 

Equipment Master File

If the Select certain equipment field in control record EPACHG is set to Y, and the Break Misc into 2 fields field in control record RAEQM3 is also set to Y, an extra Miscellaneous field (with a user-defined label) displays in Equipment Maintenance.  Enter a decal number for either SMM taxing or EPA charge purposes in this extra field.

 

When you set the Select certain equipment field to Y, the system calculates environmental charges only for equipment where there is information in the last 15 characters of the Miscellaneous field (EMMISC) in the Equipment Master File (EQPMASFL).  These last 15 characters are typically the equipment's decal number, and they come from breaking the Miscellaneous field into two fields in the RAEQM3 control record to make the extra 15-character field.

 

Back to top

Scenario for Method 1:

Your organization operates only in Colorado, and the only environmental fee it charges is a 2.50% Special Mobile Machinery (SMM) tax on certain pieces of rental equipment in several category/classes.  Your settings are as follows:

 

Control Record Settings:

CNTYRQ

Make county required - Y

 

RAEQM3

Break Misc into 2 fields - Y

2nd Misc field heading - Decal Number (or similar)

 

EPACHG

Use EPA charge - Y

Calc based on rental $ - Y

Select certain equipment - Y

Detail sequence # - 9000

EPA percent - 2.50

EPA Item # - SMM (or similar)

EPA Stock Class - MISC (or similar)

 

EPACH2

Include DW in calc'd amt - N

Include Del/PU in amt - N

Tax EPA like DW - N

Use CMEPAC for SMM chg - N

Use ECSMM for all equip - N

 

Master File Settings:

Miscellaneous Charge Item Master

Create item SMM (or similar) with a miscellaneous charge type of TX=Taxes.

 

County Code Master

Charge SMM Tax field - Y (for all applicable counties)

 

Customer Job Master

County field - Enter a valid county (this field is required in this scenario)

 

Equipment Master

Decal Number (or similar) field - Enter the county SMM decal number only for equipment that is taxed

 

Category/Class Master

Charge SMM/EPA Tax field - Enter Y for the category/classes that are assigned to equipment for which you charge SMM tax.  This setting is only used to calculate estimated SMM tax charges when you enter a rental reservation/quote for a category/class with this field set to Y.

 

Back to top

Method 2

Method 2 is using two programs on the Rental File Maintenance (RAMNUM) menu:  Environmental Charge Control Maintenance and Equipment Environmental Charge Maintenance only.  Use this method if you only use one type of environmental fee, but you want to have more control over which category/classes are charged that fee and how much they are charged.

 

You cannot use this method if you want to include damage waiver and delivery and pickup charges in the overall rental contract amount that the system uses to calculate the amount to charge for environmental fees.

 

There are NO control record settings related to this method.  The master file settings are as follows:

Miscellaneous Charge Item Master File

Create a miscellaneous item for the environmental charge you will be using.  This item must have a miscellaneous charge type of EC=Environment Charge.  If you are NOT applying environmental charges as a percentage of the contract amount, ensure that you have entered a Regular price for the environmental miscellaneous charge item.

 

Environmental Charge Control Master

Use the Environmental Charge Control Maintenance program to enter the environmental miscellaneous charge item you want to default into rental contracts.  Enter this at the location level, and enter the minimum and maximum charges for that location.  These charges apply unless you set different ones at the category/class level in Equipment Environmental Charge Maintenance.

 

Equipment Environmental Charge Master

Use the Equipment Environmental Charge Maintenance program to enter the environmental charges to default on rental contracts for one or all locations and one or all category/classes.  Indicate whether you want to use a flat rate, a percentage, or a daily, weekly, or monthly rate, and then enter the rate amount and the minimum and maximum charges allowed.

 

Scenario for Method 2:

Your organization only uses one type of environmental fee that is not specific to customers or certain pieces of equipment, but the fee does vary by location and by category/class.  For location 001, the environmental fee is a flat $10.00 for category/class 010-3100, and $15.00 for category/class 025-4250.  For location 002, the environmental fee is 1.50% for category/class 011-0210, and 2.25% for category/class 600-0002.  Your settings are as follows:

 

Master File Settings:

Miscellaneous Charge Item Master

Create item EPA (or similar) with a miscellaneous charge type of EC=Environment Charge.

 

Environmental Charge Control Master

For Location 001 - enter item number EPA with a minimum charge of .00 and a maximum charge of 15.00.

For Location 002 - enter item number EPA with a minimum charge of .00 and a maximum charge of 9,999.00.

 

Equipment Environmental Charge Master

For Location 001 - category/class 010-3100 - enter a Flat rate type with an amount of 10.00, a minimum charge of .00 and a maximum charge of 10.00.

For Location 001 - category/class 025-4250 - enter a Flat rate type with an amount of 15.00, a minimum charge of .00 and a maximum charge of 15.00.

For Location 002 - category/class 011-0210 - enter a Percent rate type with an amount of 1.50, a minimum charge of .00, and a maximum charge of 1.50.

For Location 002 - category/class 600-0002 - enter a Percent rate type with an amount of 2.25, a minimum charge of .00, and a maximum charge of 2.25.

 

Back to top

Method 3

Method 3 is a combination of Methods 1 and 2 where you set up control records, master file settings, and the two programs:  Environmental Charge Control Maintenance and Equipment Environmental Charge Maintenance.  Use this method when you need to charge more than one type of environmental fee.

 

All control records and master file settings related to environmental charges were explained in previous sections of this topic, so they are not repeated here.

 

Scenario for Method 3:

Your organization uses two types of environmental fees.  One type is a fuel surcharge of 5% based on rental delivery and pickup amounts for some of your customers, and the other type is an EPA fee of $10.00 charged for your 220-0321 category/class of equipment.  Your settings are as follows:

 

Control Record Settings (for the fuel surcharge):

EPACHG

Use EPA charge - Y

Calc based on rental $ - Y

Select certain equipment - Y (this stops the fuel surcharge from being charged as a percentage of the contract's rental amount)*

Detail sequence # - 9000

EPA percent - 5.00

EPA Item # - FUEL (or similar)

EPA Stock Class - MISC (or similar)

 

*Setting Select certain equipment to Y causes the system to check the Equipment Master File (EQPMASFL) to determine if the last 15 characters in the Miscellaneous (EMMISC) field are populated for any equipment.  If it finds no equipment with these 15 characters populated, all rental amounts are skipped in the fuel charge calculation.

 

EPACH2

Include DW in calc'd amt - N

Include Del/PU in amt - Y

Use CMEPAC for SMM chg - Y

 

EPACH3

EPA Charge on sales - Y (to optionally add the fuel surcharge against delivery and pickup amounts for sales orders/invoices.)

 

Master File Settings (for both fuel surcharge and EPA fee):

Miscellaneous Charge Item Master

Create item FUEL (or similar) with a miscellaneous charge type of EC=Environment Charge.

Create item EPA (or similar) with a miscellaneous charge type of EC=Environment Charge.

 

Customer Master

EPA Charge field - Enter Y for customers that will receive the fuel surcharge for deliveries and pickups.

 

Environmental Charge Control Master

For Location XXX - enter item number EPA (or similar) with a minimum charge of .00 and a maximum charge of 10.00

 

Equipment Environmental Charge Master

For Location XXX - category/class 220-0321 - enter a Flat rate type with an amount of 10.00, a minimum charge of .00 and a maximum charge of 10.00.

 

Related Topics

Customer Job Entry

Customer Master Maintenance

Category/Class Maintenance

Environmental Charge Control Maintenance

Equipment Environmental Charge Maintenance

Equipment Maintenance

Miscellaneous Charge Item Maintenance

 

 

Back to top